연락처

텍트로닉스 담당자와 실시간 상담 6:00am-4:30pm PST에 이용 가능

전화

전화 문의

9:00am-6:00PM KST에 이용 가능

다운로드

매뉴얼, 데이터 시트, 소프트웨어 등을 다운로드할 수 있습니다.

다운로드 유형
모델 또는 키워드

피드백

I want to compare the VM6000 automatic measurement of front porch on a video signal to a manual measurement. What setup is required for manual measurement using a DELAY function?

질문:

I want to compare the VM6000 automatic measurement of front porch on a video signal to a manual measurement. What setup is required for manual measurement using a DELAY function?

답변:

There are several measurements that need to be made prior to doing a delay measurement.

  1. You need to measure the height of the pedestal before the front porch. Use a MEASURE High, with histogram determination of the high.  Gate the measurement with cursors on the bar.
  2. Measure the blanking level, using same procedure, but with cursors on the blanking area.
  3. Measure the negative sync pulse amplitude, using same procedure and gating inn the sync area.
  4. Subtract the measurement made in step 2 from the measurement made in step 1.  Divide by 2 and write down this value.
  5. The measurement made in step 3 from the measurement made in step 2. Divide by 2 and write down this value.
  6. Go to the measurement setup. 
  7. Select Delay measurement
  8. Select reference LEVELS SETUP
  9. Set units to absolute
  10. Set mid ref source 1 to the value determined in step 3
  11. Set mid ref source 2 to the value determined in step 4.

Delay measurement is now set up correctly for the signal.


이 FAQ는 다음에 적용 됩니다:

제품 시리즈 없음

제품:

FAQ ID 60841

모든 FAQ 보기 »